Renesas Electronics Case Study

Managing Three Conflicting KPIs at the Diffusion Area with Multi-objective Optimization

Download this case study to learn:


  • The particularities of the diffusion area that make it such a complex scheduling problem
  • The tradeoffs that occurred at Renesas Electronics’ US wafer fab when they tried to decrease cycle time and increase batch size
  • Our intelligent multi-objective approach
  • The impressive results our scheduler gathered within a realistic simulation environment

More resources

Stay up to date with our latest publications.
Fab Management Forum 2022

Recap on the first of two presentations from SEMICON Europa 2022 – featuring case study results from three different wafer fabs, including Renesas and Seagate.

Technical Paper

This technical paper provides a comprehensive overview of results from benchmark studies performed for Seagate Technology, where our solution was applied to metrology toolset scheduling.

White Paper

Our white paper details a new approach to wafer fab scheduling. A novel hybrid model that delivers optimized schedules in a matter of minutes to help fabs cut costs and increase efficiency.

Seagate Case Study 1.0

Discover how we helped a highly-utilised Seagate Technology wafer fab reduce cycle time and boost efficiency by applying our next-generation production scheduling solution.

Seagate Case Study 2.0

Learn how applying multi-objective optimization helped to increase throughput whilst reducing reticle moves and queue time.

An Introduction to Flexciton

Gain a comprehensive understanding of where we came from, what we do, and why we’re different with our company introduction.