Connect and visualise the whole fab with Flex Global
Gain total visibility and control of fab-wide WIP. Flex Global connects toolset schedulers, manages timelink constraints, and guides WIP flow to boost toolset efficiency and reduce cycle time.
.avif)
Monitor fab dynamics in real time
The Heatmap feature provides a birds-eye view of fab congestion across time and tools. Helping you to monitor fab dynamics in real time, identify issues before they escalate, and take proactive control of WIP direction with one glance.

Global foresight for local precision
Flex Global connects toolset schedulers like Flex Local, ensuring the right WIP arrives at the right time. It gives local schedulers the foresight to make smarter decisions, enabling better batching, balance, and performance across the fab.
Master the most complex constraints
Timelink constraints are too complex for rule-based schedulers — but not for Flex Global. It optimises across them effortlessly, delivering gains in batching and queue time whilst reducing scrap.

Guaranteed KPI improvements
Flexciton’s Autonomous Technology empowers chip manufacturers to maximise production performance with far greater confidence. By replacing outdated, reactive systems with intelligent, real time data-driven decision-making, we deliver optimised plans and schedules—enabling fabs to run with greater precision and autonomy.
Increase in throughput in the photo area
Reduction in timelink violations in the diffusion area
Increase in batch size across the diffusion area
The autonomous advantage
The fab floor doesn’t stand still. Neither should your scheduler. See how Flex Global stacks up against legacy scheduling approaches.
Dynamic Approach
Consistent KPIs improvement. Optimiser always providing optimal solution independent of fab state.
Fixed Approach
Fixed rules do not maximise the potential of the fab. Production KPIs optimum only for a single state.
Autonomous
By setting objectives once; it autonomously adapts to fab changes, tool downtime, new recipes, and shifting priorities.
50% - 80% of 1 Eng FTE
Engineering resources required to understand and then to maintain legacy solutions, re-tuning at every change in fab state.
Trade-offs visualised
Set fab KPIs weights confidently with clear understanding of all trade-offs.
Trial and error
Tuning rules weights with limited confidence if objectives will be achieved.
Typically 12 months To Full Deployment
Simple testing and roll-out whilst adapting to customer needs. Benefits begin right away.
2 - 3 Years To Full Deployment
Long roll-out process, requires considerable time and resources to set-up and test rules during roll-out.