Improving Wafer Fab Capacity by Applying Advanced Scheduling to the Photolithography Area
Download this case study to discover:
Discover how Flexciton and FabTime partnered to help Renesas Electronics overcome resource constraints and begin visualising and optimizing their wafer fab performance.
Learn how Flexciton and FabTime's innovative combined technology can help fabs to comprehensively visualise and optimise their KPIs even whilst navigating resource constraints and objective trade offs.
Learn how we applied multi-objective optimization to the diffusion area at Renesas Electronics to manage three conflicting KPIs.
Recap on the first of two presentations from SEMICON Europa 2022 – featuring case study results from three different wafer fabs, including Renesas and Seagate.
This technical paper provides a comprehensive overview of results from benchmark studies performed for Seagate Technology, where our solution was applied to metrology toolset scheduling.
Our white paper details a new approach to wafer fab scheduling. A novel hybrid model that delivers optimized schedules in a matter of minutes to help fabs cut costs and increase efficiency.
Discover how we helped a highly-utilised Seagate Technology wafer fab reduce cycle time and boost efficiency by applying our next-generation production scheduling solution.