Product
View all products
Toolset scheduling
Effortlessly boost tool performance
Fab-wide scheduling
Connect and visualise the whole fab
Production planning
Optimize WIP flow over the next 4 weeks
Technology
The intelligence layer for better decision-making.
Solutions
By Teams
Fab management
Industrial engineering
Manufacturing
Production control
By Products
Toolset scheduling
Fab-wide scheduling
Production planning
Solutions
Explore use cases that solve real operational challenges
Resources
Blog
About
Careers
Contact
  • Product
    View all products
    Toolset scheduling
    Effortlessly boost tool performance
    Fab-wide scheduling
    Connect and visualise the whole fab
    Production planning
    Optimize WIP flow over the next 4 weeks
    Technology
    The intelligence layer for better decision-making.
  • Solutions
    By Teams
    Fab management
    Industrial engineering
    Manufacturing
    Production control
    By Products
    Toolset scheduling
    Fab-wide scheduling
    Production planning
    Solutions
    Explore use cases that solve real operational challenges
  • Resources
  • Blog
  • About
  • Careers
  • Contact
Flex Apps
Flex Local

Effortlessly boost tool performance with Flex Local

Say goodbye to manual rules and constant parameter tweaking. Flex Local enables you to optimize toolset KPIs like throughput, cycle time, and reticle moves autonomously.

Use cases
Speak to an expert

Drive fab efficiency from the toolset level

Flex Local leverages AI and mathematical optimization to enhance toolset KPIs and drive consistent efficiency. Simply define your overall objective, and the system continuously optimizes WIP flow, manages complex trade-offs, and generates optimal schedules in real time.

Use cases

Set objectives, not parameters

Smart fabs aren’t run with repeat trial-and-error. Flex Local removes the need for never-ending parameter tuning by autonomously making intelligent decisions in order to achieve your desired objectives. It automatically adapts to the changing fab environment, saving valuable engineering time and delivering consistent performance.

Use cases
Use cases

Shopfloor actions in real time

Complex scheduling decisions filtered down into a simple checklist. The Runway feature gives manufacturing specialists live, prioritised actions — like when to load, unload, or changeover — through a clean, intuitive interface designed for portable use. Everything needed for daily execution at your fingertips.

Use cases
“Since deployment, we’ve improved moves while reducing risk of reticle breakages and our manufacturing specialists always give positive feedback on the scheduling.”
Impact

Guaranteed KPI improvements

Flexciton’s Autonomous Technology empowers chip manufacturers to maximise production performance with far greater confidence. By replacing outdated, reactive systems with intelligent, real time data-driven decision-making, we deliver optimised plans and schedules—enabling fabs to run with greater precision and autonomy.

Learn moreSpeak to sales
9.4%

Increase in throughput in the photo area

29%

Reduction in timelink violations in the diffusion area

18%

Increase in batch size across the diffusion area

Comparison

The autonomous advantage

The fab floor doesn’t stand still. Neither should your scheduler. See how Flex Local stacks up against legacy scheduling approaches.

Capability
Flex Local
Legacy Systems
Performance

Dynamic Approach

Consistent KPIs improvement. Optimiser always providing optimal solution independent of fab state.

Fixed Approach

Fixed rules do not maximise the potential of the fab. Production KPIs optimum only for a single state.

Labour efficiency

Autonomous

By setting objectives once; it autonomously adapts to fab changes, tool downtime, new recipes, and shifting priorities.

50% - 80% of 1 Eng FTE

Engineering resources required to understand and then to maintain legacy solutions, re-tuning at every change in fab state.

Predictability

Trade-offs visualised

Set fab KPIs weights confidently with clear understanding of all trade-offs.

Trial and error

Tuning rules weights with limited confidence if objectives will be achieved.

Deployment Speed

Typically 12 months To Full Deployment

Simple testing and roll-out whilst adapting to customer needs. Benefits begin right away.

2 - 3 Years To Full Deployment

Long roll-out process, requires considerable time and resources to set-up and test rules during roll-out.

Speak to one of our experts

Book a demo session or simply reach out to one of our experts to learn more about what Autonomous Technology could do for your fab. 

Book a demo
Subscribe to receive the latest articles, publications and news.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Explore
HomeProductsSolutionsResourcesGlossary
Company
About usCareersTeamBlog & News
Contact
Get in touchRequest a demoFAQ

Powering your autonomous factory transition.

X
LinkedIn
© 2025 Flexciton. All rights reserved.
Privacy PolicyTerms of ServiceSecurity